FLAT JACKS
Low height steel capsule jacks
The Structural Engineer's Solution for Temporary & Permanent Load Transfer


Home

Permanent Flat Jacks

Permanent Flat Jacks

Cementitious grout or epoxy resin inflation
Where a force is required to be permanently applied to a structure, Flat Jacks are inflated under pressure with grout or epoxy resin by means of special purpose injection cylinder. The grout or epoxy resin hardens over a period of time to leave the force permanently applied. This type of application is suitable for pre-loading new or additional support steelwork in structures, underpinning works and structural bearing installation.

 
Arch Load Transfer - Broadgate, UK
 
ARCH LOADING TRANSFER
Broadgate, UK

Cementitious grout is preferred over epoxy resin whenever possible mostly because it is more environmentally acceptable. However, in some cases such as complex synchronised inflation of multiple jacks, resin is the only suitable injection substance. This method is often used where sufficient room is not available for wedging or grouting the jacking gap.

In certain circumstances it may be necessary to carry out the initial inflation on oil or water with resin inflation being carried out at a later date. A grout or transfusion system is then required.

Transfusion of oil or water to grout or epoxy resin
There are two basic methods of transfusion of Flat Jacks that are pressurised with hydraulic oil or water:

Single special transfusion Flat Jacks method
At individual jack locations single special transfusion jacks, which are purpose designed and manufactured, can be transfused with grout or resin under load. The pressure within the Flat Jack is balanced and maintained throughout the process of transfusing.

Additional Flat Jacks method
If adequate space is available two Flat Jacks may be installed one above the other. The first is inflated with hydraulic fluid and adjusted as necessary over a period of time until the required condition is achieved. Then the second Flat Jack is inflated directly with grout or epoxy resin. The pressures in both Flat Jacks are balanced throughout until the oil or water Flat Jacks has closed and the inflation is completed on the grout or resin Flat Jack. This will then harden and both jacks will remain in position permanently.

Use of cementitious grout or epoxy resin
The most common epoxy resin used in Flat Jack inflation is a two part pouring grade mixture to which an accelerator is added in varying amounts to produce a setting time suitable for the location, ambient conditions and application.

The mixing and pumping of grout or epoxy resins requires considerable skill and experience. Incomplete mixing with hardener may result in failure to set. Excessive accelerator may cause premature setting which will cause blockage, frustrate the Flat Jacking operation and damage the pumping equipment.

For these reasons grout or resin injection equipment is not hired to third parties and Fagioli Limited contract service of injection is strongly recommended.